Report

Report

Author: United States. Congress. House

Publisher:

Published:

Total Pages: 1778

ISBN-13:

DOWNLOAD EBOOK


Congressional Record

Congressional Record

Author: United States. Congress

Publisher:

Published: 1939

Total Pages: 1046

ISBN-13:

DOWNLOAD EBOOK

The Congressional Record is the official record of the proceedings and debates of the United States Congress. It is published daily when Congress is in session. The Congressional Record began publication in 1873. Debates for sessions prior to 1873 are recorded in The Debates and Proceedings in the Congress of the United States (1789-1824), the Register of Debates in Congress (1824-1837), and the Congressional Globe (1833-1873)


Before Religion

Before Religion

Author: Brent Nongbri

Publisher: Yale University Press

Published: 2013-01-22

Total Pages: 328

ISBN-13: 0300154178

DOWNLOAD EBOOK

Examining a wide array of ancient writings, Brent Nongbri dispels the commonly held idea that there is such a thing as ancient religion. Nongbri shows how misleading it is to speak as though religion was a concept native to pre-modern cultures.


Guide to U.S. Elections

Guide to U.S. Elections

Author: Deborah Kalb

Publisher: CQ Press

Published: 2015-12-24

Total Pages: 2189

ISBN-13: 1483380351

DOWNLOAD EBOOK

The CQ Press Guide to U.S. Elections is a comprehensive, two-volume reference providing information on the U.S. electoral process, in-depth analysis on specific political eras and issues, and everything in between. Thoroughly revised and infused with new data, analysis, and discussion of issues relating to elections through 2014, the Guide will include chapters on: Analysis of the campaigns for presidency, from the primaries through the general election Data on the candidates, winners/losers, and election returns Details on congressional and gubernatorial contests supplemented with vast historical data. Key Features include: Tables, boxes and figures interspersed throughout each chapter Data on campaigns, election methods, and results Complete lists of House and Senate leaders Links to election-related websites A guide to party abbreviations