Estimating Highway Preconstruction Services Costs
Author: H. David Jeong
Publisher:
Published: 2016
Total Pages: 112
ISBN-13: 9780309375535
DOWNLOAD EBOOKRead and Download eBook Full
Author: H. David Jeong
Publisher:
Published: 2016
Total Pages: 112
ISBN-13: 9780309375535
DOWNLOAD EBOOKAuthor: Douglas D. Gransberg
Publisher:
Published: 2016
Total Pages: 100
ISBN-13: 9780309375542
DOWNLOAD EBOOK"TRB's National Cooperative Highway Research Program (NCHRP) Report 826: Estimating Highway Preconstruction Services Costs presents guidance for state departments of transportation (DOTs) and other agencies for estimating preconstruction services (PCS) costs for transportation project development. PCS refers to a varied assortment of project-specific engineering and other professional services required before construction begins on a bridge, highway, or other transportation project, whether provided by agency staff or consultants. Volume 1: Guidebook addresses principal sources and components of PCS costs, PCS estimating methodologies, trends (such as changes in design and construction technology, design standards, program requirements, and professional workforce) likely to affect PCS costs, and advice on agency policies and practices that can help control program risk through improved PCS cost estimation. Accompanying Volume 1, Volume 2: Research Report documents the development, testing, validation, and packaging of an accurate, consistent, and reliable method for estimating PCS costs."--
Author: Stuart D. Anderson
Publisher: Transportation Research Board
Published: 2007
Total Pages: 290
ISBN-13: 0309098750
DOWNLOAD EBOOK'TRB's National Cooperative Highway Research Program (NCHRP) Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction explores approaches to cost estimation and management designed to overcome the root causes of cost escalation and to support the development of consistent and accurate project estimates through all phases of the development process, from long-range planning, through priority programming, and through project design. NCHRP Web-Only Document 98 details the steps followed by the research team in the development of NCHRP Report 574"--Publisher's description.
Author: Deryl Burch
Publisher: Craftsman Book Company
Published: 1997
Total Pages: 458
ISBN-13: 9780934041966
DOWNLOAD EBOOKThis manual shows you, in simple, easy -to-understand language, how to calculate the amount of dirt you'll have to move, the cost of owning and operating the machines you'll do it with, and finally, how to assign bid prices to each part of the job. Using clear, detailed illustrations and examples, the author makes it easy to follow and duplicate his system. The book ends with a complete sample estimate, from the take-off to completing the bid sheet.Included in this book: -- How to set up & use an organized & logical estimating system -- How to read plans & specs -- Why a site visit is mandatory -- How to assess accessibility & job difficulty -- How soil haracteristics can affect your estimate -- The best ways to evaluate subsurface conditions -- Figuring your overhead -- How to get the information you need from contour maps -- When you have to undercut -- Dealing with irregular regions and odd areas -- Factors for estimating swell and shrinkage -- Balancing the job: spoil & borrow -- Calculating machine owning & operating costs -- The two common methods of estimating earthwork quantities
Author: The Chartered Institute of Building
Publisher: John Wiley & Sons
Published: 2018-05-29
Total Pages: 293
ISBN-13: 1119329469
DOWNLOAD EBOOKThe essential, authoritative guide to providing accurate, systematic, and reliable estimating for construction projects—newly revised Pricing and bidding for construction work is at the heart of every construction business, and in the minds of construction consultants’ poor bids lead to poor performance and nobody wins. New Code of Estimating Practice examines the processes of estimating and pricing, providing best practice guidelines for those involved in procuring and pricing construction works, both in the public and private sectors. It embodies principles that are applicable to any project regardless of size or complexity. This authoritative guide has been completely rewritten to include much more contextual and educational material as well as the code of practice. It covers changes in estimating practice; the bidding process; the fundamentals in formulating a bid; the pre-qualification process; procurement options; contractual arrangements and legal issues; preliminaries; temporary works; cost estimating techniques; risk management; logistics; resource and production planning; computer-aided estimating; information and time planning; resource planning and pricing; preparation of an estimator’s report; bid assembly and adjudication; pre-production planning and processes; and site production. Established standard for the construction industry, providing the only code of practice on construction estimating Prepared under the auspices of the Chartered Institute of Building and endorsed by a range of other professional bodies Completely rewritten since the 7th edition, to include much more contextual and educational material, as well as the core code of practice New Code of Estimating Practice is an important book for construction contractors, specialist contractors, quantity surveyors/cost consultants, and for students of construction and quantity surveying.
Author: Douglas D. Gransberg
Publisher: Transportation Research Board
Published: 2010
Total Pages: 137
ISBN-13: 0309143012
DOWNLOAD EBOOKTRB's National Cooperative Highway Research Program (NCHRP) Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs explores current methods in which state departments of transportation and other public engineering agencies are applying construction manager-at-risk (CMR) project delivery to their construction projects. CMR project delivery is an integrated team approach to the planning, design, and construction of a highway project, to help control schedule and budget, and to help ensure quality for the project owner. The team consists of the owner; the designer, who might be an in-house engineer; and the at-risk construction manager. The goal of this project delivery method is to engage at-risk construction expertise early in the design process to enhance constructability, manage risk, and facilitate concurrent execution of design and construction without the owner relinquishing control over the details of design as it would in a design-build project.
Author: Chris Hendrickson
Publisher: Chris Hendrickson
Published: 1989
Total Pages: 425
ISBN-13: 0137312660
DOWNLOAD EBOOKAuthor: Lee August Rodegerdts
Publisher: Transportation Research Board
Published: 2010
Total Pages: 407
ISBN-13: 0309155118
DOWNLOAD EBOOKTRB's National Cooperative Highway Research Program (NCHRP) Report 672: Roundabouts: An Informational Guide - Second Edition explores the planning, design, construction, maintenance, and operation of roundabouts. The report also addresses issues that may be useful in helping to explain the trade-offs associated with roundabouts. This report updates the U.S. Federal Highway Administration's Roundabouts: An Informational Guide, based on experience gained in the United States since that guide was published in 2000.
Author: Transportation Research Board
Publisher: National Academies Press
Published: 2003-03-21
Total Pages: 60
ISBN-13: 0309088879
DOWNLOAD EBOOKBoston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.