Guidebook for Implementing Alternative Technical Concepts in All Types of Highway Project Delivery Methods

Guidebook for Implementing Alternative Technical Concepts in All Types of Highway Project Delivery Methods

Author: Douglas D. Gransberg

Publisher:

Published: 2020

Total Pages: 0

ISBN-13: 9780309481632

DOWNLOAD EBOOK

The past decade has been characterized by the pressing need to rapidly renew the nation's deteriorating infrastructure, which has driven the increased use of alternative contracting methods for transportation and other infrastructure projects. The TRB National Cooperative Highway Research Program's NCHRP Research Report 937: Guidebook for Implementing Alternative Technical Concepts in All Types of Highway Project Delivery Methods is designed to help guide alternative technical concepts (ATCs) in the state highway project delivery process. The ATC process--used with design-build highway project delivery--solicits design modification ideas offered by respondents during the bidding process. These modifications aim to encourage innovation and improve design requirements while giving the respondent a competitive advantage. The report is accompanied by an Excel-based ATC Implementation Toolkit and an associated publication, NCHRP Web-Only Document 277: Implementing Alternative Technical Concepts in All Types of Highway Project Delivery Methods.


Construction Manager-at-risk Project Delivery for Highway Programs

Construction Manager-at-risk Project Delivery for Highway Programs

Author: Douglas D. Gransberg

Publisher: Transportation Research Board

Published: 2010

Total Pages: 137

ISBN-13: 0309143012

DOWNLOAD EBOOK

TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs explores current methods in which state departments of transportation and other public engineering agencies are applying construction manager-at-risk (CMR) project delivery to their construction projects. CMR project delivery is an integrated team approach to the planning, design, and construction of a highway project, to help control schedule and budget, and to help ensure quality for the project owner. The team consists of the owner; the designer, who might be an in-house engineer; and the at-risk construction manager. The goal of this project delivery method is to engage at-risk construction expertise early in the design process to enhance constructability, manage risk, and facilitate concurrent execution of design and construction without the owner relinquishing control over the details of design as it would in a design-build project.


Alternative Technical Concepts for Contract Delivery Methods

Alternative Technical Concepts for Contract Delivery Methods

Author: Douglas D. Gransberg

Publisher:

Published: 2014

Total Pages: 120

ISBN-13:

DOWNLOAD EBOOK

"TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 455: Alternative Technical Concepts for Contract Delivery Methods Transportation documents various methods by which agencies have successfully implemented alternative technical concepts (ATCs) during the highway contracting process. The report identifies methods that promote transparency and fairness, while at the same time protecting the industry's right to confidentiality. The U.S. Federal Highway Administration defines an ATC as "a request by a proposer to modify a contract requirement, specifically for that proposer's use in gaining competitive benefit during the bidding or proposal process ... [and] must provide a solution that is equal to or better than the owner's base design requirements in the invitation for bid or request for proposal document."--Publisher's note.