Deicing/Anti-Icing Diagrams/No Spray Zones
Author: G-12T Training and Quality Programs Committee
Publisher:
Published: 2019
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOKThis document shall be used in conjunction with: - AS6286, Training and Qualification Program for Deicing/Anti-icing of Aircraft on the Ground - AS6286/1, Processes Including Methods - AS6286/2, Equipment - AS6286/3, Fluids - AS6286/4, Weather - AS6286/5, Health, Safety and First Aid SAE G-12T, Training and Quality Programs Committee recommends AS6286/1 to AS6286/6 be cancelled since the requirements in this AS have been superseded by and re-introduced into Aerospace Standard AS6286 "Training and Qualification Program for Deicing/Anti-icing of Aircraft on the Ground" (which now includes the six corresponding Slash Sheets). All of these documents address training for aircraft ground de/anti-icing. AS6286 was developed as a global standard and the slash sheets caused confusion in some areas . As a result, all the appropriate requirements in AS6286 Slash Sheets 1 to 6 have been carried over to the new AS (i.e., there are no aspects of the slash sheets that are not covered by the superseding AS). As such, AS6286/1 to AS6286/6 should be cancelled and considered for "Archival Use Only". This proposal to cancel SAE AS6286/1 to AS6286/6 is based on the guidance provided in the SAE Aerospace Council document "Organization and Operating Procedures", section 7.4.2, which identifies that one of the grounds for cancelling a document is "when its technical requirements are totally superseded by another document."