Report

Report

Author: United States. Congress. House

Publisher:

Published:

Total Pages: 2794

ISBN-13:

DOWNLOAD EBOOK


Journal of the House of Representatives of the United States

Journal of the House of Representatives of the United States

Author: United States. Congress. House

Publisher:

Published: 1956

Total Pages: 1344

ISBN-13:

DOWNLOAD EBOOK

Some vols. include supplemental journals of "such proceedings of the sessions, as, during the time they were depending, were ordered to be kept secret, and respecting which the injunction of secrecy was afterwards taken off by the order of the House."


Annual Report of the Commandant

Annual Report of the Commandant

Author: Army Service Schools (U.S.)

Publisher:

Published: 1907

Total Pages: 206

ISBN-13:

DOWNLOAD EBOOK

Vol. for 1906 includes the reports of the Commandant of U.S. Signal School and Staff College.


The Conservation of Cave 85 at the Mogao Grottoes, Dunhuang

The Conservation of Cave 85 at the Mogao Grottoes, Dunhuang

Author: Neville Agnew

Publisher: Getty Publications

Published: 2014-02-01

Total Pages: 476

ISBN-13: 1606061577

DOWNLOAD EBOOK

The Mogao Grottoes, a World Heritage Site in northwestern China, are located along the ancient caravan routes—collectively known as the Silk Road—that once linked China with the West. Founded by a Buddhist monk in the late fourth century, Mogao flourished over the following millennium, as monks, local rulers, and travelers commissioned hundreds of cave temples cut into a mile-long rock cliff and adorned them with vibrant murals. More than 490 decorated grottoes remain, containing thousands of sculptures and some 45,000 square meters of wall paintings, making Mogao one of the world’s most significant sites of Buddhist art. In 1997 the Getty Conservation Institute, which had been working with the Dunhuang Academy since 1989, began a case study using the Late–Tang dynasty Cave 85 to develop a methodology that would stabilize the deteriorating wall paintings. This abundantly illustrated volume is the definitive report on the project, which was completed in 2010.