Baseline Comparison Report for Project W-058, Replacement of the Cross-site Transfer System. Revision 1
Author:
Publisher:
Published: 1995
Total Pages: 33
ISBN-13:
DOWNLOAD EBOOKThis BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed.