CapX2020 Application to the Minnesota Public Utilities Commission for Certificates of Need for Three 345 KV Transmission Line Projects with Associated System Connections

CapX2020 Application to the Minnesota Public Utilities Commission for Certificates of Need for Three 345 KV Transmission Line Projects with Associated System Connections

Author:

Publisher:

Published: 2007

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

Applicants include: Central Minnesota Municipal Power Agency ; Dairyland Power Cooperative ; Great River Energy ; Minnesota Power ; Minnkota Power Cooperative ; Missouri River Energy Services ; Otter Tail Power Company ; Rochester Public Utilities ; Southern Minnesota Municipal Power Agency ; Wisconsin Public Power, Inc. ; and Xcel Energy.


Pleasant Valley-Byron 161 KV Transmission Line Certificate of Need Application

Pleasant Valley-Byron 161 KV Transmission Line Certificate of Need Application

Author: Minnesota Public Utilities Commission

Publisher:

Published: 2010*

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

On December 2, 2009, Northern States Power, also called Xcel Energy, filed an application for a Certificate of Need with the Minnesota Public Utilities Commission for a new 161 kV transmission line west of Rochester. The line will be approximately 18 miles long and connect the Byron Substation in the City of Byron on the north end to the Pleasant Valley Substation in Pleasant Valley Township, Mower County on the south end. It would enable two new 100 megawatt wind farms to deliver power and provide additional generation outlet capability in the Pleasant Valley Substation area.