Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate

Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate

Author: K. W. Chau

Publisher: Springer

Published: 2017-12-18

Total Pages: 1500

ISBN-13: 9811061904

DOWNLOAD EBOOK

This book presents the proceedings of CRIOCM_2016, 21st International Conference on Advancement of Construction Management and Real Estate, sharing the latest developments in real estate and construction management around the globe. The conference was organized by the Chinese Research Institute of Construction Management (CRIOCM) working in close collaboration with the University of Hong Kong. Written by international academics and professionals, the proceedings discuss the latest achievements, research findings and advances in frontier disciplines in the field of construction management and real estate. Covering a wide range of topics, including building information modelling, big data, geographic information systems, housing policies, management of infrastructure projects, occupational health and safety, real estate finance and economics, urban planning, and sustainability, the discussions provide valuable insights into the implementation of advanced construction project management and the real estate market in China and abroad. The book is an outstanding reference resource for academics and professionals alike.


The Construction Industry in the Fourth Industrial Revolution

The Construction Industry in the Fourth Industrial Revolution

Author: Clinton Aigbavboa

Publisher: Springer

Published: 2019-08-09

Total Pages: 617

ISBN-13: 3030265285

DOWNLOAD EBOOK

This book gathers papers from the 11th Construction Industry Development Board (cidb) Postgraduate Research Conference, held on 28–30 July 2019 in Johannesburg, South Africa. The conference provided an essential forum for reviewing and generating knowledge on Construction 4.0 and, consequently, highlighted processes and practices that allow us to deliver and operate built environment assets more effectively and efficiently by focusing on physical-to-digital and digital-to-physical transformation. The event addressed three broad themes: Industrial production (prefabrication, 3-D printing and assembly, offsite and advanced manufacturing); Cyber-physical systems (actuators, sensors, IoT, robots and cobots for repetitive and dangerous tasks, and drones for mapping, progress monitoring, safety and quality inspections, lifting, moving and positioning); and Technologies (digital ecosystems, digital platforms, BIM, video and laser scanning, AI and cloud computing, big data and data analytics, reality capture, blockchain, simulation, virtual and augmented reality, data standards and interoperability, and vertical and horizontal integration). Given its scope, the book will be of interest to all construction industry and architectural professionals who want to learn about cutting-edge technologies applied to construction


CIB Proceedings 2015: Going north for sustainability: Leveraging knowledge and innovation for sustainable construction and development

CIB Proceedings 2015: Going north for sustainability: Leveraging knowledge and innovation for sustainable construction and development

Author: Prof. Charles Egbu

Publisher: Lulu.com

Published: 2015

Total Pages: 624

ISBN-13: 1326479512

DOWNLOAD EBOOK

This International Conference is about sustainability in its wider sense. It is an important area of discourse, as it pertains to how we work and how we lead our lives while considering the lives and workplaces of future generations. The conference particularly sets out to explore some of the developments and challenges taking place in academia and industry in both the Northern and Southern hemispheres. The conference is entitled "Going north for sustainability". The North signifies progress in technology, education and other areas of human endeavour to many people. Progress requires that people learn across continents and cultures.


Construction Digitalisation

Construction Digitalisation

Author: Douglas Aghimien

Publisher: Routledge

Published: 2021-07-25

Total Pages: 181

ISBN-13: 1000415953

DOWNLOAD EBOOK

This book explores construction digitalisation, particularly in developing countries. The book conceptualises a digitalisation capability maturity model that will enable construction organisations to self-assess and benchmark their digital capabilities in their quest for digital transformation. Digitalisation offers a significant solution to the age-long problems of the construction industry. Research shows that when construction organisations transform from a traditional service delivery approach to a more digitalised approach, significant improvement in project delivery and better competitive advantage for these organisations will be attained. The attainment of these benefits is evident in developed countries where the digitalisation of construction activities continues apace. Unfortunately, the story is not the same for construction organisations in developing economies. While some organisations might be willing to be digitally transformed, most have no clue how to go about it. To this end, this book provides guidelines for construction organisations seeking to transform their entities digitally. Its content is a valuable read for construction company owners as it provides a model which they can use in the digitalisation of their activities. Also, regulatory bodies in the construction industry can adopt the capabilities identified in the book as essential prerequisites for their members. Furthermore, the book serves as excellent theoretical background reading for management researchers seeking to expand their knowledge on the digitalisation of the construction industry and other associated industries.


Dissertation Research and Writing for Construction Students

Dissertation Research and Writing for Construction Students

Author: Shamil Naoum

Publisher: Routledge

Published: 2012-05-23

Total Pages: 224

ISBN-13: 1136409912

DOWNLOAD EBOOK

Aimed specifically at students on BSc and taught Masters programmes who are embarking on research for the first time, this book is clear with explanatory text supported by numerous examples illustrating good practice.


Megaprojects and Risk

Megaprojects and Risk

Author: Bent Flyvbjerg

Publisher: Cambridge University Press

Published: 2003-02-13

Total Pages: 226

ISBN-13: 9780521009461

DOWNLOAD EBOOK

Megaprojects and Risk provides the first detailed examination of the phenomenon of megaprojects. It is a fascinating account of how the promoters of multi-billion dollar megaprojects systematically and self-servingly misinform parliaments, the public and the media in order to get projects approved and built. It shows, in unusual depth, how the formula for approval is an unhealthy cocktail of underestimated costs, overestimated revenues, undervalued environmental impacts and overvalued economic development effects. This results in projects that are extremely risky, but where the risk is concealed from MPs, taxpayers and investors. The authors not only explore the problems but also suggest practical solutions drawing on theory, experience and hard, scientific evidence from the several hundred projects in twenty nations and five continents that illustrate the book. Accessibly written, it will be the standard reference for students, scholars, planners, economists, auditors, politicians and interested citizens for many years to come.


Schedule Delay Analysis

Schedule Delay Analysis

Author: American Society of Civil Engineers

Publisher:

Published: 2017

Total Pages: 25

ISBN-13: 9780784414361

DOWNLOAD EBOOK

Standard ANSI/ASCE/CI 67-17 presents 35 guiding principles that can be used on construction projects to assess responsibility for delays and to calculate associated damages.


New Code of Estimating Practice

New Code of Estimating Practice

Author: The Chartered Institute of Building

Publisher: John Wiley & Sons

Published: 2018-05-29

Total Pages: 293

ISBN-13: 1119329469

DOWNLOAD EBOOK

The essential, authoritative guide to providing accurate, systematic, and reliable estimating for construction projects—newly revised Pricing and bidding for construction work is at the heart of every construction business, and in the minds of construction consultants’ poor bids lead to poor performance and nobody wins. New Code of Estimating Practice examines the processes of estimating and pricing, providing best practice guidelines for those involved in procuring and pricing construction works, both in the public and private sectors. It embodies principles that are applicable to any project regardless of size or complexity. This authoritative guide has been completely rewritten to include much more contextual and educational material as well as the code of practice. It covers changes in estimating practice; the bidding process; the fundamentals in formulating a bid; the pre-qualification process; procurement options; contractual arrangements and legal issues; preliminaries; temporary works; cost estimating techniques; risk management; logistics; resource and production planning; computer-aided estimating; information and time planning; resource planning and pricing; preparation of an estimator’s report; bid assembly and adjudication; pre-production planning and processes; and site production. Established standard for the construction industry, providing the only code of practice on construction estimating Prepared under the auspices of the Chartered Institute of Building and endorsed by a range of other professional bodies Completely rewritten since the 7th edition, to include much more contextual and educational material, as well as the core code of practice New Code of Estimating Practice is an important book for construction contractors, specialist contractors, quantity surveyors/cost consultants, and for students of construction and quantity surveying.


Estimating and Tendering for Construction Work

Estimating and Tendering for Construction Work

Author: Martin Brook

Publisher: Routledge

Published: 2016-12-08

Total Pages: 349

ISBN-13: 1317561732

DOWNLOAD EBOOK

Estimators need to understand the consequences of entering into a contract, often defined by complex conditions and documents, as well as to appreciate the technical requirements of the project. Estimating and Tendering for Construction Work, 5th edition, explains the job of the estimator through every stage, from early cost studies to the creation of budgets for successful tenders. This new edition reflects recent developments in the field and covers: new tendering and procurement methods the move from basic estimating to cost-planning and the greater emphasis placed on partnering and collaborative working the New Rules of Measurement (NRM1 and 2), and examines ways in which practicing estimators are implementing the guidance emerging technologies such as BIM (Building Information Modelling) and estimating systems which can interact with 3D design models With the majority of projects procured using design-and-build contracts, this edition explains the contractor’s role in setting costs, and design statements, to inform and control the development of a project’s design. Clearly-written and illustrated with examples, notes and technical documentation, this book is ideal for students on construction-related courses at HNC/HND and Degree levels. It is also an important source for associated professions and estimators at the outset of their careers.


Beyond Strategy

Beyond Strategy

Author: Robin Speculand

Publisher: John Wiley & Sons

Published: 2009-11-02

Total Pages: 147

ISBN-13: 0470824980

DOWNLOAD EBOOK

In the last few years implementation has become an integral part of strategy discussions due to the staggering failure of organizations to deliver on the strategy promises. In Beyond Strategy, Robin shifts his focus from why strategy implementation is important, which was the focus of his last international best seller Bricks to Bridges, to what leaders must do differently. Implementation of strategy can't simply be delegated. In the book he provides the structure, framework and specific actions leaders must take to go beyond strategy and deliver on their promises. The book is divided in to the areas of the Implementation Compass, a tool for implementing strategy that identifies the eight global best practices of implementation. Each chapter ends with the actions leaders must take. The book is concise, based on the latest thinking and packed with useful tips and case studies.