Uniform System of Accounts Prescribed for Public Utilities and Licensees (class D)
Author: United States. Federal Power Commission
Publisher:
Published: 1961
Total Pages: 106
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: United States. Federal Power Commission
Publisher:
Published: 1961
Total Pages: 106
ISBN-13:
DOWNLOAD EBOOKAuthor: Stanley Dowlen Bussey
Publisher:
Published: 1983
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOKArcheological surveys of portions of proposed Public Service Company of Oklahoma 345-kV electrical transmission line corridor from Oklaunion, Texas, to Lawton, Oklahoma, were performed by archeologists from The Bentham Group, Oklahoma City. The areas surveyed comprised about 67 percent (45 miles) of the total length of the transmission corridor. Two short segements could not be surveyed because the landowners denied access. Two prehistoric archeological sites were found in Oklahoma. Both were light lithic scatters without depth or shaped or diagnostic artifacts. Additionally, two twentieth-century farmhouse sites were found, one in Oklahoma and one in Texas. A modern household dump exhibiting very recent refuse was also found in Oklahoma. Construction of electrical transmission lines within the portions of the corridor that were surveyed should have no impact on cultural resource sites that are potential sources of significant data. No further cultural resources work is recommended for the areas that were surveyed. It is recommended that archeological surveys be performed on the two areas where access was refused after access is obtained.
Author: Steven Sarich
Publisher:
Published: 2021
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOK