Quarterly Groundwater Monitoring Third Report

Quarterly Groundwater Monitoring Third Report

Author:

Publisher:

Published: 1993

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report is presented to summarize the results of the quarterly groundwater sampling at the Weldon Spring Training Area (WSTA) and surrounding Weldon Spring Ordnance Works (WSOW) performed in August 1992.


Quarterly Groundwater Monitoring Fourth Report

Quarterly Groundwater Monitoring Fourth Report

Author:

Publisher:

Published: 1993

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report is presented to summarize the results of the quarterly groundwater sampling at the Weldon Spring Training Area (WSTA) and surrounding Weldon Spring Ordnance Works (WSOW) performed in November and December 1992.


Quarterly Groundwater Monitoring Second Report

Quarterly Groundwater Monitoring Second Report

Author:

Publisher:

Published: 1992

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report is presented to summarize the results of the quarterly groundwater sampling at the Weldon Spring Training Area (WSTA) and surrounding Weldon Spring Ordnance Works (WSOW) performed in May/June 1992.


Quarterly Groundwater Monitoring First Quarter Sampling Results Fort Dix, New Jersey

Quarterly Groundwater Monitoring First Quarter Sampling Results Fort Dix, New Jersey

Author:

Publisher:

Published: 1990

Total Pages: 70

ISBN-13:

DOWNLOAD EBOOK

The first quarter sampling activities included a reconnaissance survey to locate and inspect the wells at the landfill and to select those to be included in the Monitoring Program. As a result of the survey, two wells (MW-8 and WES-3), which were vandalized or otherwise damaged, were excluded from the Monitoring Program. The selected wells and some related data are listed in Table 1. The locations of the wells are shown in Figure 1. The wells were purged and sampled in accordance with procedures specified in the Draft Sampling and Analysis Plan (SAP), Fort Dix Follow-on Remedial Investigation/Feasibility Study, prepared by Dames & Moore. The sample containers were labeled, packed on ice in coolers, and shipped overnight with completed chain-of-custody forms to ESE for chemical analysis. The samples were analyzed for VOCS as well as for total and dissolved priority pollutant metals and iron. The analytical results are presented in Tables 2 and 3. Table 2 shows only the results for analyte concentrations above detection limits while Table 3 presents all analytical data.


Third Quarterly Groundwater Monitoring Report Weldon Spring Ordnance Works, February 1996

Third Quarterly Groundwater Monitoring Report Weldon Spring Ordnance Works, February 1996

Author:

Publisher:

Published: 1996

Total Pages:

ISBN-13:

DOWNLOAD EBOOK

This report summarizes results of the second joint groundwater sampling round at the Weldon Spring Ordnance Works (WSOW) being investigated under the supervision of the U.S. Army Corps of Engineers, and the Weldon Spring Site Remedial Action Project (WSSRAP) located within the WSOW boundary under the control of the Department of Energy (DOE).