Borehole Data Package for Well 299-E33-44 at Single-shell Tank Waste Management Area B-BX-BY.
Author: Duane G. Horton
Publisher:
Published: 1999
Total Pages:
ISBN-13:
DOWNLOAD EBOOKRead and Download eBook Full
Author: Duane G. Horton
Publisher:
Published: 1999
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2000
Total Pages: 78
ISBN-13:
DOWNLOAD EBOOKTwo new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) B-BX-BY during December 1999 through February 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) Milestone M-24-45. The wells are 299-E33-334 and 299-E33-335. These wells were installed in support of the WMA B-BX-BY assessment to track the movement of contaminant plumes that appear to be entering the WMA from the northeast. Well 299-E33-334 is located outside the southwest corner of the 241-BX tank farm and well 299-E33-335 is located south of the 241-BX tank farm. The locations of all wells in the extended monitoring network for WMA B-BX-BY are shown on Figure 1. The new wells were constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, in the assessment groundwater monitoring plan (Narbutovskih 2000), and in the description of work for well drilling and installation. This document compiles information on the drilling, construction, well development, pump installation, and sampling activities applicable to wells 299-E33-334 and 299-E33-335. Appendix A contains copies of the Well Summary Sheets (as-built diagrams), the Well Construction Summary Reports, and the geologist's logs. Appendix B contains results of laboratory analyses of moisture content on samples from 299-E33-334 (moisture data were not collected from well 299-E33-335). Appendix C contains borehole geophysical logs and Appendix D contains analytical results from groundwater samples obtained during well construction. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc. English units are used in this report because that is the system of units used by drillers to measure and report depths and well construction details. Conversion to metric is made by multiplying feet by 0.3048 to obtain meters or multiplying inches by 2.54 to obtain centimeters.
Author:
Publisher:
Published: 2002
Total Pages:
ISBN-13:
DOWNLOAD EBOOKThis document provides information on the construction of three new RCRA wells (299-E33-337, 299-E33-338, and 299-E33-339) at Waste Management Area B-BX-BY in July and August 2001.
Author: Duane G. Horton
Publisher:
Published: 2000
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2003
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2000
Total Pages: 35
ISBN-13:
DOWNLOAD EBOOKOne new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the single-shell tank farm Waste Management Area (WMA) TX-TY during December 1999 and January 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-43. The well is 299-W15-41 and is located south of the 241-TX tank farm and south of 20th Street in the 200 West Area. Figure 1 shows the locations of all wells in the WMA TX-TY monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for WMA TX-TY (Caggiano and Goodwin 1991), the assessment plan for WMA TX-TY (Caggiano and Chou 1993), and the description of work for well drilling and installation. This document compiles information on the drilling and construction, well development, pump installation, and sediment testing applicable to well 299-W15-41. Appendix A contains the geologist's log, the Well Construction Summary Report, and Well Summary Sheet (as-built diagram) and Appendix B contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington. English units are used in this report because that is the system of units used by drillers to measure and report depths and well construction details. Conversion to metric is made by multiplying feet by 0.3048 to obtain meters or multiplying inches by 2.54 to obtain centimeters.
Author: Duane G. Horton
Publisher:
Published: 2006
Total Pages:
ISBN-13:
DOWNLOAD EBOOKAuthor:
Publisher:
Published: 2006
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOKAuthor: Duane G. Horton
Publisher:
Published: 2006
Total Pages:
ISBN-13:
DOWNLOAD EBOOKOne new Resource Conservation and Recovery Act (RCRA) groundwater assessment well was installed at single-shell tank Waste Management Area (WMA) S-SX in fiscal year (FY) 2005 to fulfill commitments for well installations proposed in Hanford Federal Facility Agreement and Consent Order, Milestone M-24-57 (2004). The need for the new well, well 299-W22-47, was identified during a data quality objectives process for establishing a RCRA/ Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)/Atomic Energy Act (AEA) integrated 200 West and 200 East Area Groundwater Monitoring Network. This document provides a compilation of all available geologic data, spectral gamma ray logs, hydrogeologic data and well information obtained during drilling, well construction, well development, pump installation, aquifer testing, and sample collection/analysis activities. Appendix A contains the Well Summary Sheets, the Well Construction Summary Report, the geologist's Borehole Log, well development and pump installation records, and well survey results. Appendix B contains analytical results from groundwater samples collected during drilling. Appendix C contains complete spectral gamma ray logs and borehole deviation surveys.
Author:
Publisher:
Published: 2005
Total Pages: 0
ISBN-13:
DOWNLOAD EBOOK