Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area TX-TY.

Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area TX-TY.

Author:

Publisher:

Published: 2001

Total Pages: 5

ISBN-13:

DOWNLOAD EBOOK

This document compiles information on the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of five new RCRA wells in calendar year 2000 - 2001 at WMA TX-TY. Appendix A contains the Well Summary Sheets (as-built diagrams), the Well Construction Summary Reports, and the geologist's logs; Appendix B contains physical properties data; and Appendix C contains the borehole geophysical logs.


Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area S-SX.

Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area S-SX.

Author:

Publisher:

Published: 2001

Total Pages: 5

ISBN-13:

DOWNLOAD EBOOK

Six new resource conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area S-SX in July 2000 through March 2001 in partial fulfillment of Tri-Party Agreement milestones M-24-00L and M-24-00M. This document describes the drilling, construction, sampling and analyses of samples from the wells.


Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area T.

Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area T.

Author:

Publisher:

Published: 2001

Total Pages: 5

ISBN-13:

DOWNLOAD EBOOK

This document compiles information of the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of five new RCRA wells in calendar year 2000 - 2001. Appendix A contains the Well Summary Sheets (as-built diagrams); the Well Construction Summary Reports, and the geologist's logs; Appendix B contains physical properties data; and Appendix C contains the borehole geophysical logs.


Borehole Data Package for Well 299-W15-41 at Single-Shell Tank Waste Management Area TX-TY.

Borehole Data Package for Well 299-W15-41 at Single-Shell Tank Waste Management Area TX-TY.

Author:

Publisher:

Published: 2000

Total Pages: 35

ISBN-13:

DOWNLOAD EBOOK

One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the single-shell tank farm Waste Management Area (WMA) TX-TY during December 1999 and January 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-43. The well is 299-W15-41 and is located south of the 241-TX tank farm and south of 20th Street in the 200 West Area. Figure 1 shows the locations of all wells in the WMA TX-TY monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for WMA TX-TY (Caggiano and Goodwin 1991), the assessment plan for WMA TX-TY (Caggiano and Chou 1993), and the description of work for well drilling and installation. This document compiles information on the drilling and construction, well development, pump installation, and sediment testing applicable to well 299-W15-41. Appendix A contains the geologist's log, the Well Construction Summary Report, and Well Summary Sheet (as-built diagram) and Appendix B contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington. English units are used in this report because that is the system of units used by drillers to measure and report depths and well construction details. Conversion to metric is made by multiplying feet by 0.3048 to obtain meters or multiplying inches by 2.54 to obtain centimeters.